| This test is designed to verify that an ONOS cluster behaves correctly using |
| all the same verifications as the other HA tests. There is no control plane |
| failures in this test. This is so that it is easier to find the cause of bugs |
| discovered through the HA suite. |
| |
| The gerneral structure for the test: |
| - Startup |
| - Assign switches |
| - Verify ONOS state and functionality |
| - Device mastership |
| - Intents |
| - Leadership election |
| - Distributed Primitives |
| - Wait 60 seconds |
| - Verify ONOS state and functionality |
| - Dataplane failures |
| - link down and up |
| - switch down and up |