This test verifies control plane resilience from a CLUSTER restart

It consists of

  1. Configure and Install ONOS
  2. Start Mininet and check flow state
  3. Pingall
  4. Induce a CLUSTER restart
  5. check flow state
  6. Pingall

Requirements

  • An updated version of the CPQD switch has to be running to make sure it supports group chaining.

The test is executed using the netcfg subsystem: 1) APPS=openflow-base,netcfghostprovider,netcfglinksprovider

The test runs for different topologies:

  • 2x2 Leaf-Spine and 3-node ONOS cluster
  • 4x4 Leaf-Spine and 3-node ONOS cluster
  • Single switch and 3-node ONOS cluster