This test verifies connectivity in face of dynamic configuration and Onos failures using SegmentRouting
It consists of
- Configure and Install ONOS
- Start Mininet and check flow state
- Connectivity test
- Add Hosts dynamically
- Connectivity test
- Onos Failure
- Remove host configuration
Requirements
- An updated version of the CPQD switch has to be running to make sure it supports group chaining.
The test is executed using the netcfg subsystem: 1) APPS=openflow-base,netcfghostprovider,netcfglinksprovider The test runs for different topologies:
- 2x2 Leaf-Spine and 3-node ONOS cluster
- 4x4 Leaf-Spine and 3-node ONOS cluster
- Single switch and 3-node ONOS cluster